CE-2.0 National Connector and Socket Standards
Committee Scope: The scope of the ECA CE-2.0 National Connector and Socket Standards Committee is to provide industry leadership in defining the performance tests, and the mechanical and electrical characteristics of electronic connector products. These efforts are critical in ensuring robust commercial viability for such innovative products to enter the marketplace by enabling interchangeability of parts between multiple manufacturers of a particular product as well as standardized Test Procedures and Test Sequences. Liaison with other ECA committees, industry standards groups (such as SAE), trade groups (such as SFF) and military standards activities is also a charter activity. Â Committee documents typically become Accredited National Industry Standards (ANSI). Â Documents for products with international interest are submitted to the IEC (International Electrotechnical Commission) for acceptance as IEC standards.
Typical products this committee standardizes are:
I/O Connectors
Backplane Connectors
Blade and Tuning Fork Connectors
Printed Board Connectors
Rectangular Connectors
Circular Connectors
Processor, Memory and other sockets
Commercial, Industrial, Consumer, Medical and Military connectors
Through Sub-committees, the group also addresses industry test methods, terminology, plating issues, material issues, etc.  Test schedules presented in product standards may be used for qualification testing. The committee also has Test Sequence (TS) documents which may be referenced by other standards or used for qualifications for connector products that do not have an established industry standard.
Membership in CE 2.0 and subcommittees is comprised of users, producers, military, independent test labs and other interested organizations. Membership is open to organizations or individuals interested in the development of connector/socket product standards, test procedures and test sequences.
*Note: All attachments are PDF files unless noted otherwise
Committee Chairman: Frank Ruffino, Molex Inc.
| Meeting
Date |
Notice |
Agenda |
Roster |
Minutes |
Attachments* |
| September 28-29, 2010 |
|
09/28-29 (PDF) |
|
09/28-29 (PDF) |
Attachment 1
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
2.1 Agenda |
| April 26-29, 2010 |
|
04/26-29 (PDF) |
|
04/26-29 (PDF) |
Attachment 1
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7
Attachment 8
Attachemnt 9
2.1 Agenda |
| October 13-14, 2009 |
|
10/13-14(PDF) |
|
10/13-14(PDF) |
Attachment 1
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7
Attachment 8
Attachemnt 9
Attachment 10
Attachment 11
Attachment 12
Attachment 13
Attachment 14
2.1 Agenda |
| August 19, 2009 |
|
08/19 (PDF) |
|
|
2.1 Agenda |
| April 28-29, 2009 |
|
04/28-29 (PDF) |
|
04/28-29 (PDF) |
Attachment 1
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7
Attachment 8
Attachemnt 9
2.1 Agenda
2.2 Agenda |
| October 6-9,2008 |
|
10/6-9 (PDF) |
|
10/6-9 (PDF) |
Attachment 1
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7
2.1 Agenda
2.2 Agenda |
| March 28 - April 1, 2008 |
|
03/28-4/1 (PDF) |
|
03/28-4/1 (PDF) |
Attachment 1
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7A
Attachment 7B
Attachment 8
Attachment 9
Attachment 10
Attachment 11
Attachment 12
Attachment 13
2.1 Agenda
2.2 Agenda |
| September 24-27, 2007 |
|
09/24-27 (PDF) |
|
09/24-27 (PDF) |
CE 2.2 Minutes
CE 2.1 Minutes
EIA Contact List
ASTM Report
NAVAIR Report
DSCC Report
CE 2.3 Report
2.1 Agenda
2.2 Agenda |
| April 16-19, 2007 |
|
04/16-17 (PDF) |
|
04/16-17 |
CE 2.2 Minutes
CE 2.1 Minutes
EIA Contact List
IEC Report
DSCC Report
ASTM Minutes
ASTM Agenda
NAVAIR Report
2.1 Agenda
2.2 Agenda |
| September 25-29, 2006 |
|
09/25-29 (PDF) |
|
09/25-29 (PDF) |
2.1 Minutes
2.9 Minutes
EIA Contact List
DSCC Report
2.6 Report
SAE Meeting Agenda
SAE Report
ASTM Report
2.1 Agenda
2.9 Agenda |
| April 24-27, 2006 |
|
04/24-27 (PDF) |
|
04/24-27 (PDF) |
2.1 Minutes
2.9 Minutes
EIA Contact List
DSCC Report
2.6 Report
SAE Report
ASTM Report 2.1 Agenda
2.9 Agenda |
| October 17-20, 2005 |
|
10/17-18 (PDF) |
|
10/17-18(PDF) |
CE 2.1 Minutes
CE 2.9 Minutes
EIA Contact List
EIA 622 Report
DSCC Report
SAE Report
IEC Report2.1 Agenda
2.9 Agenda |
| May 16-17, 2005 |
|
05/16 (PDF)
|
|
05/16 (PDF) |
2.1 Minutes
2.9 Minutes
DSCC EIA 364
DSCC Project Status
SAE Mtg. Report
SAE Liaison Report
IEC Trip Report
ASTMB021
EIA Contact List
MVD Summary 2.1 Agenda
2.9 Agenda |
| October 5, 2004 |
|
10/05
(PDF) |
|
10/05 (PDF) |
2.1
Agenda
2.1 Minutes
2.9 Minutes |
| April 19-22, 2004 |
|
04/19-22
(PDF) |
|
04/19-22
(PDF) |
2.1
Minutes
2.9 Minutes
IEC Trip Report |
|
Back to Committees
|